ALL RIGHTS RESERVED FOR GOLDEN HORIZON CO. 2008    -    DESIGNED BY  HFM Ltd.
            
            
            
            
            
English Site
الواجهة العربية
OUR ACTIVITIES

   

Paintings, Sand Blasting

Removal of redundant FL Corridor, and Transport to specified location

3” up to 24” Redundant pipe
Cold Cutting of Redundant Flow lines

Fabrication & Erection of Hook ups Fabrication and Installation Flow line Rehabilitation of Flow lines (realign supports, Reinstall fallen off CS Pipe works, Reclaim Clamps from the leaking sections, etc)

Pipe line Construction

Supply, Fabrication & Installation of all types of Structural works

Our Activity in Mechanical Services  :